Example values shown. BS 5839-1 typically calls for 24 hours standby followed by 30 minutes (0.5 hrs) in alarm.
How it's worked out
C = 1.25 × (T1 × I1 + D × T2 × I2)
T1 standby hours, I1 quiescent current (A), T2 alarm hours, I2 alarm current (A). 1.25 allows for battery ageing. D = 1.75 de-rates lead-acid batteries for the high alarm discharge rate. For a 24 V panel use two 12 V batteries of this capacity in series, and check the panel's maximum charger capacity.
Estimate onlyPhone microphones are not calibrated. For commissioning, always use a calibrated sound level meter.
Min–
Avg–
Max–
Tap Start and allow microphone access.
Reference levels (BS 5839-1)
65 dB(A) minimum in most areas, or 5 dB(A) above background noise lasting over 30 seconds.
75 dB(A) at the bedhead where sleeping occupants must be woken.
60 dB(A) in enclosures of 60 m² or less, and at specific points of limited extent.
Calibration offset 0 dB
If you have a calibrated meter, adjust the offset until both read the same with a steady sound.
A zone plan is a geographical representation of the building clearly showing the division into fire alarm zones. The drawing of the building layout should clearly show final exits, common escape routes, circulation areas, stairs and the division of the building into fire alarm zones. Every fire alarm system has at least one fire alarm zone.
Why do I need a fire alarm zone plan?
The current British Standard BS 5839-1:2025 states that zone plans are required on every system of any size. If your fire alarm system has no zone plan in place, this should be noted as a major non-compliance during a routine maintenance visit.
Can I just have a list of zones next to the fire alarm control panel?
A list of fire alarm zones does not satisfy the recommendations of BS 5839-1:2025 for a fire alarm zone plan, as this is not a geographical representation of the building.
Where should the zone plan(s) be mounted?
The correctly orientated zone plan should be mounted by each CIE point, which are all the fire alarm control panels and repeater panels. Basically, anywhere that indicates the fire zone in alarm should have a zone plan installed, with an accurate 'You Are Here' point shown.
For full information on drawing and documentation requirements see BS 5839-1:2025, available from the BSI online shop at shop.bsigroup.com.
When installing or modifying a fire alarm system, as part of the document process, as fitted drawings must be provided. Here is a simple guide to what these drawings should include.
First, you need an adequate drawing of the building. Full CAD quality plans are a great start. If they're not available, hand drawn sketches will do as long as they accurately represent the building. You'll need these drawings for the zone plan too, so make sure all exit points, circulation areas and stairs are included as a minimum.
BS 5839-1:2025 clause 38.1 (c) says the as fitted drawings should include:
The positions of all control, indicating and power supply equipment. All fire alarm control panels, repeater panels and associated power supplies. Include battery cabinets if they are remote from the panels, for example in a nearby cupboard or store room.
The positions of all manual call points, fire detectors and fire alarm devices. Use a different symbol for each type of device, and always include a key or legend. For interfacing equipment, say what each one interfaces with (for example access control, lifts, door holders). Add all address numbers, including loop, for addressable systems, and the position of every end of line resistor. Mark it 'EOL' with the circuit it ends, such as EOL Z1 or EOL SCCT2.
The positions of all equipment that might need routine attention or replacement. For example short circuit isolators and remote indicators. Where isolators are built into devices, say so in the key (for example 'Manual call point c/w integral short circuit isolator'). Add the routes of any aspirating pipework, with sampling points and low level test points.
The type, sizes and actual routes of cables. A general note covers type and size, for example 'All cable 2c 1.5mm fire rated (red)', with any exceptions such as 4 core cable marked individually. The actual cable routes must be shown. A schematic that just 'joins the dots', or a note that wiring is in address order, does not meet the recommendations. Show where multiple cables run together with enough space to tell them apart. Include the mains supply to the control equipment, ideally with the distribution board reference and circuit breaker number. The aim is that a competent person can find the cable to fix a fault or extend the system.
Don't forgetIf a system is extended, update the existing as fitted drawings to show the changes and additions.
Helpful information to add to drawings
Give each drawing a unique number so the rest of the completion paperwork can reference it.
Add audibility test readings to the plan. It's good practice to include your sound level meter details, serial number and calibration date.
Add cable test results, referencing the drawing numbers in the handover paperwork.
If you use CAD, build most of the above into your templates. If you don't, a specialist fire alarm CAD company such as QDOS can create bespoke templates for you.
For full information see BS 5839-1:2025, available from the BSI online shop at shop.bsigroup.com.
A simple sketch will do. Include all walls, doors and staircases, like this hand drawn mark up.
TipIf the premises have ceiling tiles, count them to work out the length and width of rooms. The drawing doesn't have to be to scale, but this keeps it close to the actual layout.
Marking up paper drawings
If the customer has paper drawings, mark them up, scan them and send them to us. Everything needs to be legible. If we can't see it, we can't draw it!
Photographing drawings
Make sure the drawings are flat.
Take the photo directly above or in front of the drawing, not at an angle.
Make sure there's no glare or reflection, and the camera is in focus.
Send the photo at the largest size possible so we can zoom in without it going blurred.
Do notDo
Checklist
Include the site name and address, and anything else you'd like shown on the finished zone plan.
Lay the phone flat on the surface, or stand it on its edge.
Use the spirit level to level your fire alarm devices. Lay the phone flat to check both axes, or stand it on an edge for a single reading. Use Zero to cancel out a phone case or camera bump.